Naval Base Coronado, Coastal Campus

Design-build project including two buildings, each building is two-stories and approximately 96,000 GSF for a total of 192,000 GSF for the Special Operations Forces Operations Facility for Naval Special Warfare Group ONE.

UCSD SIO NIST MESOM Laboratory

Laboratory Building with exposed architectural cast-in-place concrete shear walls and elevated slabs, with SOG and spread footings system